Mounted on standard 8-ton excavators. 90%+ local soil usage, zero Portland cement requirement, continuous Raschel sleeve dispensing, and automated catenary dome engineering for hardened fortifications and resilient habitats.
Live Field Kinematics
Full-scale continuous extrusion attachment in tactical earth excavation
Dramatically decreases reliance on imported materials and supply chains.
Replaces up to 60 concrete trucks with a single cassette transport vehicle.
Eliminates high-cost curing chemicals, additives, and precious potable water.
Interchangeable attachment directly deployed on existing engineering fleets.
One unified robotic architecture engineered for extreme front-line military survival and sustainable humanitarian shelter.
Modern loitering munitions, FPV suicide drones, and indirect artillery shatter traditional concrete barriers with lethal secondary spalling. CJC FORT provides continuous high-inertia soil monolithic domes and berms.
Automated corbelled catenary domes provide direct overhead protection without complex formwork or vulnerable flat roof beams.
Eliminates up to 90% of cement convoy tonnage. A single tactical truck carrying sleeve cassettes replaces 60+ cement and gravel mixer trucks.
Reduces labor from a platoon of 30 soldiers digging for days down to 2 machine operators completing a bunker in 4–6 hours.
Automatic extrusion of blast-damping earth walls with dual barbed wire reinforcing.
Addressing global housing crises and climate vulnerabilities with circular, zero-carbon construction that uses the earth beneath our feet.
400mm thick compressed earth walls provide exceptional natural thermal inertia, cutting active cooling and heating energy demand by up to 70%.
Superadobe's continuous helical geometry bonded with dual barbed wire creates flexible monolithic structures that dissipate earthquake shockwaves.
Provides immediate, durable dignified shelter following earthquakes, hurricanes, or floods utilizing on-site debris and soil.
True catenary arch structural curves requiring zero formwork or toxic synthetic binders.
CAD-verified 40-part parametric engineering designed for maximum field durability and quick maintenance.
Optimized non-clog curved funnel feeding graded soil by gravity and auxiliary auger directly into the packaging chute.
Continuous tubular geotextile sleeve pack dispensing in real-time around the 400mm compacted earth core.
Automatic tension spools embedding twin strands of 4-point galvanized barbed wire between courses for immense shear interlock.
Multi-piston pneumatic/hydraulic dynamic compactor delivering continuous vertical impact to reach >95% standard Proctor density.
Universal mechanical and hydraulic coupling compatible with military and commercial 8-to-12 ton tracked excavators.
Every gear, bracket, and nozzle is parametrically linked in a unified codebase with automated interference and clearance checking.
Select wall perimeter length to project logistical savings compared to traditional concrete 3D printing and HESCO bastions.
Field application mockups, CAD-verified vault geometries, and CJC FORT brand presence.
Mounted on standard quick-hitch pins for zero-delay integration with excavators.
Validated multi-angle study of corbelled earth courses without tensile cracking.
Field-tested gear, safety standards, and operational protocol on active sites.
We welcome discussions with defense innovation units (USACE, DIU, Army xTech), impact investors, and construction contractors.